BIM model of a complete industrial plant with the fire-protection network routed on it
BIM digital twin

Industrial manufacturer

From the surroundings of a machine to be replaced to most of the plant digitised, commission after commission.

  • ServiceBIM digital twin
  • SectorOther industries

What was done

The first commission was small: replace one machine and know beforehand what was really around it, because the available documentation did not answer that.

A3D scanned and modelled that area to validate the intervention. With the result in hand came the next commission, and the next: the model grew area by area until it covered most of the plant.

Today the plant validates fire protection layouts on the model and prepares its operations with it. Each new area builds on what the previous one has already demonstrated.

Case study 07

From replacing a machine to deciding on the model, area after area

Digitisation started with the area of a machine that was going to be replaced and continued area by area: today fire protection layouts are validated on the model and operations are prepared with it.

What was happening

An industrial manufacturer had to replace a piece of equipment and needed to know, before ordering it, what was really around it. The available documentation did not settle it.

What we did

A3D scanned and modelled that area to validate the intervention. With the result in hand came the next commission, and the next: the model grew area by area until it covered the plant.

What changed

Today the plant validates fire protection layouts on the model and manages its operations with it. Each new area builds on what the previous one has already proved.

View this case on the case studies page →

Does your plant look like this one?

Each project started with a measured area: a bounded scan, a model of the real condition and a decision based on data. If you have an intervention ahead, it is bounded, measured and validated.