Library of process BIM components: ball, gate and butterfly valves modelled by A3D
BIM digital twin

Industrial paint manufacturer

Almost the whole plant scanned and the critical area modelled component by component, from the reactor to the valve.

  • ServiceBIM digital twin
  • SectorChemical and petrochemical

What was done

Extending an area with crowded reactors and pipes is a leap in the dark until a reliable model exists: equipment that does not fit, lines that have to be rerouted and walls that come down mid-works.

A3D scanned almost the whole plant in 3D and modelled the critical area in BIM component by component, drawing on its own library of parametric reactors and valves.

The client now validates extensions to the critical area on the model: what fits, what moves and which pipe is affected. The twin covers almost the whole plant, with different levels of detail.

Case study 05

What fits and what moves is decided in 3D

The documentation of the critical area lives in an as-built model, from the reactor to the valve, and extensions are checked there before they are carried out.

What was happening

Extending an area with crowded reactors and pipework is a leap in the dark without a reliable model: equipment that does not fit, lines to reroute and walls that have to come down in the middle of the works.

What we did

A3D scanned the whole plant in 3D and modelled the critical area in BIM, component by component, with its own library of parametric reactors and valves.

What changed

The client now validates every extension in 3D before touching the plant: what fits, what moves and which pipe is affected, with the model as the single reference.

View this case on the case studies page →

Does your plant look like this one?

Each project started with a measured area: a bounded scan, a model of the real condition and a decision based on data. If you have an intervention ahead, it is bounded, measured and validated.