Wastewater treatment plant (WWTP)
Laser scanning and BIM model of the real condition of a wastewater plant, with the equipment coded to talk to the plant’s databases.
- Floor area6,700 m²
- ServiceBIM digital twin
- SectorWater treatment
What was done
The plant was digitised as part of the operator’s asset digitisation strategy: documenting the real condition of the plant so that it can be managed from an up-to-date model.
A3D laser-scanned the facility and built the BIM model on the point cloud. The schematic diagrams, the plant documentation and first-hand accounts from the people who operate it were added to the model.
Every element came out coded and parameterised, ready to link to the CMMS and to the facility’s databases. That is the step that turns a model of the current state into the basis of a digital twin useful for operation and maintenance.
Project images
-
Point cloud of the whole site, taken with a laser scanner. -
Detail of the capture: pipes, valves and walkways. -
Walkways between reactors, at plant level. -
Treatment channels and operations building. -
The whole plant, from the air. -
Pumping room: pumps and valves, element by element. -
Circular clarifiers. -
Diagram of the whole site on its plot. -
Overview of the treatment line. -
From the walkway, over the channels.