{"id":6289,"date":"2022-06-14T12:03:38","date_gmt":"2022-06-14T12:03:38","guid":{"rendered":"https:\/\/a3d.es\/bim-and-cleanrooms-in-the-pharmaceutical-industry\/"},"modified":"2023-03-05T12:15:21","modified_gmt":"2023-03-05T12:15:21","slug":"bim-and-cleanrooms-in-the-pharmaceutical-industry","status":"publish","type":"post","link":"https:\/\/a3d.es\/en\/bim-and-cleanrooms-in-the-pharmaceutical-industry\/","title":{"rendered":"BIM and cleanrooms in the pharmaceutical industry"},"content":{"rendered":"\n<p>Today we kick off a series of posts on the benefits of <strong>BIM<\/strong> methodology for the <strong>pharmaceutical industry<\/strong>, a <a href=\"https:\/\/a3d.es\/en\/pharma\/\">sector<\/a> A3D has been working with for many years. In this first post we explain why <strong>BIM<\/strong> is so relevant for <strong>cleanroom<\/strong> projects, one of the most intriguing and challenging areas in the pharmaceutical industry.<\/p>\n\n<h2 class=\"wp-block-heading\">Why does the pharmaceutical industry ask for BIM?<\/h2>\n\n<p>Let\u2019s start at the beginning: What does <strong>BIM methodology<\/strong> bring to the <strong>pharmaceutical industry<\/strong>? Briefly, we might say that working with a <strong>BIM model<\/strong> brings accuracy and quality. These merits are greatly appreciated in the <strong>pharmaceutical<\/strong> sector, a value-added industry which is ideally suited to <strong>BIM<\/strong> which is a value-added tool.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"670\" src=\"https:\/\/a3d.es\/wp-content\/uploads\/2022\/06\/3-1024x670.jpg\" alt=\"\" class=\"wp-image-5120\" title=\"\" srcset=\"https:\/\/a3d.es\/wp-content\/uploads\/2022\/06\/3-1024x670.jpg 1024w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/06\/3-300x196.jpg 300w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/06\/3-768x503.jpg 768w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/06\/3-1536x1005.jpg 1536w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/06\/3.jpg 1650w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\">What are the advantages of BIM methodology for cleanrooms?<\/h2>\n\n<p><strong>Cleanrooms<\/strong> are areas designed and built to maintain specific cleanliness, temperature, humidity, pressure, air flow and lighting conditions. Below are the main <strong>cleanroom<\/strong> features where <strong>BIM methodology<\/strong> brings the most benefits:<\/p>\n\n<h3 class=\"wp-block-heading\">Assembled construction<\/h3>\n\n<p><strong>Cleanrooms<\/strong> are usually built with a system of panels assembled together similar to a Lego construction. The <strong>BIM methodology<\/strong> is ideally suited to this way of building as it allows the construction pre-design of each component to be fine-tuned down to the last detail.<\/p>\n\n<h3 class=\"wp-block-heading\">Financial cost<\/h3>\n\n<p><strong>Cleanrooms<\/strong> are very expensive to build due to their high performance and the complexity of their equipment and facilities. This makes <strong>BIM<\/strong> a powerful partner as it makes it possible to assemble a 3D model that helps to plan each <strong>cleanroom<\/strong> component in detail, thereby minimising unforeseen events and cost overruns on site.<\/p>\n\n<h3 class=\"wp-block-heading\">Space requirements<\/h3>\n\n<p>Besides the needs of each object (walls, panels, doors, etc.), a <strong>cleanroom<\/strong> has very specific requirements such as renewal pressure, class or volume. These features can be built into the <strong>BIM model\u2019s<\/strong> room-object to furnish extremely handy correlations between the requirements of the physical and virtual spaces.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"765\" src=\"https:\/\/a3d.es\/wp-content\/uploads\/2022\/06\/2-1024x765.jpg\" alt=\"\" class=\"wp-image-5121\" title=\"\" srcset=\"https:\/\/a3d.es\/wp-content\/uploads\/2022\/06\/2-1024x765.jpg 1024w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/06\/2-300x224.jpg 300w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/06\/2-768x574.jpg 768w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/06\/2.jpg 1446w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n<p>In a nutshell, we might say that the big advantage of <strong>BIM methodology<\/strong> for the <strong>pharmaceutical industry<\/strong> is that it means all of a project\u2019s information can be brought together in a single 3D model. This is a major shift compared to the conventional methodology using 2D plans where all the documentation is handled separately (plans, measurements, manufacturing, spec sheets, etc.).<\/p>\n\n<p>Combining all this information in a <strong>BIM model<\/strong> streamlines workflows and significantly reduces the number of errors. And that\u2019s not only in the design and construction of a <strong>cleanroom<\/strong> as it also makes it easier to maintain these areas over time.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Today we kick off a series of posts on the benefits of BIM methodology for the pharmaceutical industry, a sector A3D has been working with for many years. In this first post we explain why BIM is so relevant for cleanroom projects, one of the most intriguing and challenging areas in the pharmaceutical industry. Why [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":6149,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6289","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categorizar"],"_links":{"self":[{"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/posts\/6289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/comments?post=6289"}],"version-history":[{"count":0,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/posts\/6289\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/media\/6149"}],"wp:attachment":[{"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/media?parent=6289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/categories?post=6289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/tags?post=6289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}