{"id":6283,"date":"2022-07-11T08:13:27","date_gmt":"2022-07-11T08:13:27","guid":{"rendered":"https:\/\/a3d.es\/bim-piping-in-the-pharmaceutical-industry\/"},"modified":"2023-03-05T11:48:49","modified_gmt":"2023-03-05T11:48:49","slug":"bim-piping-in-the-pharmaceutical-industry","status":"publish","type":"post","link":"https:\/\/a3d.es\/en\/bim-piping-in-the-pharmaceutical-industry\/","title":{"rendered":"BIM piping in the pharmaceutical industry"},"content":{"rendered":"\n<p>Industrial <strong>piping<\/strong> consists of planning and building a piping system to carry fluids, liquids and\/or gases. <strong>Piping<\/strong> in the <strong>pharmaceutical industry<\/strong> is extremely complex, especially when compared to other types of buildings, and calls for a great deal of planning.<\/p>\n\n<p>This is why using <strong>BIM<\/strong> makes more sense than ever as it allows you to set the specifications of each pipe and check its feasibility in the 3D model. In this post we\u2019ll explore the aspects to bear in mind when using <strong>BIM<\/strong> to plan a <strong>piping<\/strong> system for the <strong>pharmaceutical industry<\/strong>.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"718\" src=\"https:\/\/a3d.es\/wp-content\/uploads\/2022\/07\/Tuberias-BIM-esmaltadas-1024x718.jpg\" alt=\"\" class=\"wp-image-5226\" title=\"\" srcset=\"https:\/\/a3d.es\/wp-content\/uploads\/2022\/07\/Tuberias-BIM-esmaltadas-1024x718.jpg 1024w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/07\/Tuberias-BIM-esmaltadas-300x210.jpg 300w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/07\/Tuberias-BIM-esmaltadas-768x538.jpg 768w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/07\/Tuberias-BIM-esmaltadas.jpg 1258w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\">Using BIM Libraries <\/h2>\n\n<p>The <strong>BIM libraries<\/strong> which come by default in Revit, the most used <strong>BIM<\/strong> software, do not contain the type of piping used in the <strong>pharmaceutical industry<\/strong>. So it\u2019s crucial to have your own <strong>BIM libraries<\/strong> tailored to the industry\u2019s specifications. <\/p>\n\n<p>At A3D we have proprietary <strong>libraries<\/strong> with 95% of the specifications already in place due to our vast experience in <strong>BIM for piping<\/strong> systems in the <strong>pharmaceutical industry<\/strong>. These <strong>libraries<\/strong> are crucial to ensure quality and flexibility in <strong>BIM<\/strong> for <strong>piping<\/strong> systems.<\/p>\n\n<h2 class=\"wp-block-heading\">Respecting types<\/h2>\n\n<p>When carrying out <strong>BIM work<\/strong> for a <strong>piping<\/strong> system in the <strong>pharmaceutical industry<\/strong>, you have to factor in the construction of each type of pipe since each component has very specific features you need to know about: flanges, welds, elbow radii, etc. <\/p>\n\n<p><strong>BIM<\/strong> for <strong>piping<\/strong> means you can, for example, ensure access to each weld or change of material. This is an issue you simply cannot ignore since ensuring proper pipe maintenance is crucial in the <strong>pharmaceutical industry<\/strong>. <\/p>\n\n<h2 class=\"wp-block-heading\">Designing your own specifications<\/h2>\n\n<p>At A3D we always recommend working with your own specifications based on regulations and ensuring that all associated documentation (isometric, lists of materials, joints, etc.) is as precise as possible. This is the only way to avert unexpected problems when constructing and using <strong>piping<\/strong> systems in <strong>pharmaceutical industry<\/strong> buildings. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"724\" src=\"https:\/\/a3d.es\/wp-content\/uploads\/2022\/07\/Valvula-de-bola-automatica-1024x724.jpg\" alt=\"\" class=\"wp-image-5227\" title=\"\" srcset=\"https:\/\/a3d.es\/wp-content\/uploads\/2022\/07\/Valvula-de-bola-automatica-1024x724.jpg 1024w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/07\/Valvula-de-bola-automatica-300x212.jpg 300w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/07\/Valvula-de-bola-automatica-768x543.jpg 768w, https:\/\/a3d.es\/wp-content\/uploads\/2022\/07\/Valvula-de-bola-automatica.jpg 1251w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\">A3D\u2019s experience in BIM Piping<\/h2>\n\n<p><a href=\"https:\/\/a3d.es\/en\/projects\/pharma-projects\/\">Our experience<\/a> in developing <strong>piping<\/strong> systems in <strong>BIM<\/strong> for the <strong>pharmaceutical industry<\/strong> confirms that this methodology is the solution of choice for this kind of project. Crafting a <strong>BIM model<\/strong> and previewing it in 3D makes it possible to preclude errors arising from a poor 2D drawing, the conventional way of drawing which is now used less and less in this challenging industry.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Industrial piping consists of planning and building a piping system to carry fluids, liquids and\/or gases. Piping in the pharmaceutical industry is extremely complex, especially when compared to other types of buildings, and calls for a great deal of planning. This is why using BIM makes more sense than ever as it allows you to [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":6163,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[81,1],"tags":[],"class_list":["post-6283","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pharma","category-sin-categorizar"],"_links":{"self":[{"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/posts\/6283","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/comments?post=6283"}],"version-history":[{"count":0,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/posts\/6283\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/media\/6163"}],"wp:attachment":[{"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/media?parent=6283"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/categories?post=6283"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a3d.es\/en\/wp-json\/wp\/v2\/tags?post=6283"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}